Rate this post

stream P. log
operate bottom log
set log
take (haul) in log
patent log, P.log
bottom log, B.log

1. SEONMIDO L.H. abeam S/E, 1’off, P.log 50’ and reset it
2. A/CO to East when P.log showed 65’
3. Found something wrong on the log and hauled it in
4. Streamed set P.log again after examination
5. SORIDO L.H. abeam <015>, 2’ off, A/CO to <093>. P.log 143’

Эй! Моряк, почитай и это:



Добавить комментарий